>

$2.3B Eccles-Mandela four-lane highway by December

More
02 Apr 2021 11:39 #389668 by chairman
TRAFFIC congestion along the East Bank of Demerara (EBD) corridor should be reduced significantly by December, as six contracts were signed on Thursday for the construction of a $2.3 billion concrete, four-lane highway from Mandela Avenue, Georgetown to Eccles, EBD.
This project is divided into six lots: Lot one – Eccles, EBD, Lot two- Agricola, Lot three – Rome, Lot four – Houston South, Lot five – Houston North, and Lot six – South Ruimveldt.
The contracts for this phased project were distributed among six different contractors. The combined total of the winning bids to construct the four-lane highway is $2,356,914,515.
The contractors awarded are: Lot one – GuyAmerica Construction Inc. ($555M); Lot two – a joint venture among MTSUL Construcoes Limited, M&PA Investments Inc. and Consturora Cobra Eireli ($364M); Lot three – Puran Bros. Disposal Inc ($360M); Lot four – Joint Venture between Collin Talbot Contracting Services and Eron Lall Civil Engineering Works ($256M); Lot five – Aronco Services Inc. ($471M) and Lot six – JS Guyana Inc. ($352M).

Always tell someone how you feel because opportunities are lost in the blink of an eye but regret can last a lifetime.
cricketwindies.com/forum/

Please Log in or Create an account to join the conversation.

Time to create page: 0.152 seconds

Breaking News (forum)

Go to top